Skip to content
zelleo.
A residential construction site with tower cranes, a concrete pump and mixer trucks.
00Real Estate Operational Efficiency

Your price is fixed. Your waste isn’t.

Zelleo reads your construction schedule and coordinates materials, suppliers and deliveries before a shortfall stops the work.

01The problem

Materials, suppliers and deliveries are still coordinated by hand.

Schedules, supplier quotes, stock and trucks live in different places. A shortfall is usually found when the work in front of it stops, and every fix takes calls, messages and waiting.

  1. 01Delays in communication and coordination
  2. 02Fragmented data
  3. 03Poor site visibility
  4. 04Procurement and vendor delays
  5. 05Manual reports and administration
  6. 06Limited scalability
  7. 07Slow communication with clients
5%

of project cost goes on rework on average.

Construction Industry Institute, RS-153

12–15%

goes on rework on a poorly run job.

Construction Industry Institute, RS-153

10%

wastage is already allowed for on sand and site-mixed concrete, before any loss from late or mismatched supply.

CPWD Delhi Schedule of Rates

02How it works

One schedule drives the order, the supplier and the truck.

  1. 01BuilderThe construction schedule shows what material is needed, and when.
  2. 02SuppliersApproved suppliers are asked for a quote and availability at the same time.
  3. 03TransportDelivery is booked against the accepted slot.
  4. 04Approvals and statusA person approves anything outside agreed limits, and everyone sees the same status.
SuppliersSample data
Panel asked · 3 yardsAt once
YardPrice / tWindowResult
Yard 14₹ 4,180Thu 07:00–11:00Inside your limits
Yard 6₹ 4,240Thu 13:00Inside your limits
Yard 9₹ 4,520FriAbove limit · waits for you
  1. A. Approved suppliers are asked at the same time, with grade, quantity and window attached.
  2. B. Anything outside the limits you set waits for a person.
03What you gain

What the work feels like after.

  1. Better visibilityEveryone works from the same schedule, orders and delivery status.
  2. Fewer coordination gapsRequirements reach suppliers and transport before the shortfall, not after it.
  3. More informed decisionsExceptions arrive with the evidence attached, so a person can decide quickly.

We measure each of these against your own records, on your own project, from the day we start.

05The solution

That’s the problem. The Platform is how we solve it.

Every product, what it does and how it works is on the Platform. Start there, then open the one that fits.